This example shows the Design of a Boost Converter for controlling the power output of a solar PV system and helps you to:
1) Determine how the panels should be arranged in terms of the number of series-connected strings and the number of panels per string to achieve the required power rating.
2) Implement the MPPT algorithm using boost converter & Operate the solar PVsystem in the voltage control mode.
3) Select a suitable proportional gain, and phase-lead time constant for the PI controller
We can choose between two maximum power point tracking (MPPT) techniques:
INCREMENTAL CONDUCTANCE (IC)
PERTURBATION AND OBSERVATION( P&O)
PERTURBATION AND OBSERVATION( P&O)
Two MPPT techniques are implemented using the variant subsystem.
Set the variant variable MPPT to 0 to choose the perturbation and observation MPPT method.
Set the variable MPPT to 1 to choose the incremental conductance method.
Click here to download the File:
https://drive.google.com/file/d/18jxlcpsSJbIeURdfBnsRe0pL_KsBrFKi/view?usp=sharing